Stand-alone installation, General precautions – Bio-Rad UView™ 6x Loading Dye plus Mini Transilluminator User Manual

Page 5

Advertising
background image

4 UView Mini Transilluminator

Stand-alone Installation

1. Place the instrument on a bench and leave at least 10 cm of

space all around it in order to ensure ample ventilation.

2. Connect the instrument to a power source using the power

cable. The power source must be able to deliver at least 12 V
DC and 1.5 A. The plug must have a ground connection.

3. Install the socket outlet near the equipment and ensure that it

is easily accessible.

General Precautions

The transilluminator is equipped with thermal protection to prevent
overheating.

Clean the transilluminator’s UV filter surface after use. When
using samples stained with ethidium bromide, decontaminate the
transilluminator surface with bleach. Denatured alcohol can be also
used. Always wear disposable gloves.

• Plug the transilluminator into an electric line with a ground

connection

• Do not pour liquids directly on the transilluminator

• Do not block the aeration slits

• Switch off the instrument immediately after use

• Position the transilluminator to prevent harm to nearby

operators

Advertising