Primary procedure – NISSAN 2012 LEAF - First Responder's Guide User Manual
Page 18
Primary Procedure
1. Check the READY
indicator status. If it is ON, the high voltage system is active.
2. Place the selector lever in the Park (P) position.
3. Press the power switch once to turn OFF the high
voltage system. Then verify whether the READY
indicator is OFF.
4. If possible, keep the Nissan Intelligent Key® at least 5
meters (16 feet) away from the vehicle.
NOTE:
This step is not necessary if the 12V system is
already disabled.
5. Disconnect the negative (-) 12V battery cable (1).
Insulate the negative (-) battery cable terminal with
insulated tape.
NOTE:
: Arrow in illustration depicts vehicle front
direction.
6. Wait at least ten (10) minutes for complete discharge of the high voltage capacitor after the
power switch has been turned OFF.
7. Perform the first response action.
AAYIA0091ZZ
AAYIA0093ZZ
1
AAYIA0092ZZ
18