2 preparation items, 2.2 daily inspection, 2.3 insulated tools – NISSAN 2012 LEAF - Roadside Assistance Guide User Manual

Page 35: 2.2. daily inspection, 2.3. insulated tools

Advertising
background image

5-2 Preparation Items

Preparation Items

Specification

Purpose

PPE (personal protective
equipment):
Insulated gloves

Up to 1,000V

For protection from high voltage electri-
cal shock

Insulated shoes

Safety shield

Wrenches

Size:10mm

To remove the service plug access
cover bolts.

To remove the 12V battery terminal bolt.

S

olvent resistant protection

gloves
Solvent resistant protection
shoes

To utilize in the event of a Li-ion battery
electrolytic solution leak.

Absorbent pad

The same pad used for internal com-
bustion engine fluids can be used.

To absorb any Li-ion battery electrolytic
solution leakage.

Standard fire fighting
equipment

Standard fire fighting equipment
Depending on type of fire (vehicle or
battery) use standard fire fighting
equipment (water or extinguisher).

To extinguish a fire.

Insulated tape

Insulating

To cover any damaged harnesses to
protect from and prevent electrical
shock. Tape should cover all bare or
damaged wire.

5-2.1 PPE (Personal Protective Equipment) Protective Wear Control

Perform an inspection of the PPE items before beginning work. Do not use any damaged PPE items.

5-2.2 Daily Inspection

This inspection is performed before and after use. The worker who will be using the items should perform
the inspection and check for deterioration and damage.

• Insulated rubber gloves should be inspected for scratches, holes and tears. (Visual check and air

leakage test)

• Insulated safety boots should be inspected for holes, damage, nails, metal pieces, wear or other

problems on the soles. (Visual check)

• Insulated rubber sheet should be inspected for tears. (Visual check)

5-2.3 Insulated Tools

When performing work at locations where high voltage is applied (such as terminals), use insulated tools
meeting 1,000V/300A specifications.

35

Advertising