Chief Manufacturing Large Flat Panel Dual Arm Wall Mount PNR User Manual

Page 10

Advertising
background image

Model PNR™

Installation Instructions

10

bottom) and secure using two bolts (one top and one
bottom).

5.

Install four bolts (two on the top and two on the
bottom) to secure the swing arm assembly to the top
and bottom mounting brackets (See figure 14).

6.

Tighten the bolts.

7.

Install the display on the mount.

Figure 14

Figure 15

Swing Arm Tension Adjustment

Swing arm tension is pre-set at the factory and is adjusted to
accommodate displays with weights near the top of the mounts
capacity.

If smaller displays are used it may be difficult to
reposition the display after mounting. Swing arm tension
can be adjusted to compensate for smaller display by:

NOTE: The display must be mounted prior to adjusting

swing arm tension.

1.

Locate the adjustment bar and wrench provided with
the mount.

2.

Place adjustment bar into socket head cap screw
located at swing arm pivot point. (See figure 16)

NOTE: The display may need to be repositioned in order

to gain access to the tension adjustment
screw(s).

3.

Using the wrench provided with the mount, turn
adjustment bar clockwise to increase swing arm
tension or counterclockwise to reduce swing arm
tension. (See figure 17) and (See figure 18)

NOTE: Small adjustments of 1/8 turn or less are typically

all that is required to achieve desired tension.

4.

Check swing arm tension. If desired tension is
present, tension adjustment is complete. If additional
tension adjustment is required, repeat steps 2 and 3
until desired tension is achieved.

NOTE: If changing from a smaller display to a larger

display it may be necessary to increase swing
arm tension.

Figure 16

Figure 17

Top Bolts

Top Bolts

Adjustment
Bar

Wrench

Socket Head
Capscrew

Reduce

Advertising