Acronis Backup for Windows Server Essentials - User Guide User Manual

Page 375

Advertising
background image

375

Copyright © Acronis International GmbH, 2002-2014

To

Do

log

The Log (p. 385) view will display a list of the log entries related to the selected plan/task.

Run a backup
plan/task

Backup plan

1. Click

Run.

2. In the drop-down list, select the plan's task you need run.

Running the backup plan starts the selected task of that plan immediately in spite of its
schedule and conditions on the machines the plan is deployed to.

The centralized backup plan cannot be run manually, if at least one of the machines included
in the plan runs Acronis Backup & Recovery 10 agent.

Task

The task will be executed immediately in spite of its schedule.

Stop the
running backup
plan/task

Click

Stop.

Centralized backup plan

Stopping the running backup plan stops all its tasks on all the machines the plan is deployed
to. Thus, all the task operations will be aborted.

The centralized backup plan cannot be stopped manually, if at least one of the machines
included in the plan runs Acronis Backup & Recovery 10 agent.

Task

Generally, stopping the task aborts its operation (backup, recovery, validation, exporting,
conversion, etc.). The task enters the Idle state. The task schedule, if created, remains valid.
To complete the operation you will have to run the task once again.

Edit a plan/task Click

Edit.

Centralized backup plan

The editing of centralized backup plans is performed in the same way as creating. Once the
plan is edited, the management server updates the plan on all machines the plan was
deployed to.

Task

The editing of tasks is performed in the same way as their creation.

Clone a backup
plan

Click

Clone.

The clone of the original backup plan will be created with default name "Clone of
<original_plan_name>
". The cloned plan will be disabled immediately after cloning, so that it
does not run concurrently with the original plan. You can edit the cloned plan settings before
enabling it.

Enable a plan

Click

Enable.

The previously disabled backup plan will run again as scheduled.

Disable a plan

Click

Disable.

The backup plan will not run as scheduled. However, it can be started manually. After a
manual run, the plan will stay disabled. The plan will run as usual if you enable it again.

Advertising
This manual is related to the following products: