Installing the hood, Caution, Warning – FRIGIDAIRE FHPC4260LS User Manual

Page 7: Important

Advertising
background image

7

Removing the packaging

CAUTION

Remove the carton carefully. Wear gloves to
protect against sharp edges.

WARNING

Remove the protective film covering the
product before putting into operation.

Ceiling Support Structures

• This vent hood is heavy. Adequate structure

and support must be provided in all types of
installations. Framing must support minimum
150lb load.

• At the hood location, install 2”x 4” cross framing

between ceiling joists as shown. (2”x 4” are
required to support the weight of the hood.)
(fig. )

• Arrange cross framing in the ceiling to suit the

existing structure (fig. ).

• Your ceiling joists will be like one of the following

examples.

5/32”

NOTE: Do not cut the duct opening shown on
the template for the recirculating installation.

IMPORTANT

Framing must be capable of supporting 150lbs.

5/32

5/32

5/32

Installing the hood

Advertising
This manual is related to the following products: