Dell PowerEdge C5230 User Manual

Page 11

Advertising
background image

Installation and Configuration

9

Figure 1-10.

Connecting the Power Cable to the Power Supply Unit

Figure 1-11.

Locating the Power Supply Unit Sockets

4 Push the sled into the system until flush with the case and the release latch

locks.

NOTE:

The correct configuration of the integral chassis AC power cables to the

power supply unit sockets is shown in the following illustration.

1

2

3

4

5

6

7

8

9 10 11 12

PSU1 PSU2

PSU1

PSU2

Advertising