Start-up – Culligan Soft-Minder 2005 User Manual

Page 11

Advertising
background image

Installation

11

the retainer, remove and replace with the proper size.
Install the retainer and the drain line elbow adapter. The numbered side of the DLFC must face down.

Start-Up

Place approximately 1” of water above the grid plate (if used) in your salt tank. Salt may be placed in the unit at this time.
Place softener in a bypass position. Turn on the main water supply and check for any leaks. Open a cold water faucet near the

softener and run a few minutes until the system is free of any foreign material (usually solder) that may have resulted from the

installation.
Plug unit into electrical outlet. Do not insert meter cable into the meter at this time.
Electrical connections must be connected according to codes.

Advance the softener control to the backwash position. Slowly shift the bypass into the service position so that the water flows into

the mineral tanks. When water appears at the drain, shift the bypass valve to fully open. Continue to backwash until the water at

drain is clear.

Start REGEN to fill second tank. Backwash until the water at drain is clear.

Height of Discharge Above Floor Level Operating - Table 1

Operating

Pressure

0 ft (0 m)

2ft (0.6 m)

4 ft (1.2 m)

6 ft (1.8 m)

8 ft (2.4 m)

10 ft (3 m)

30 psi (210 kPa)

60 ft (18 m)

50 ft (15 m)

30 ft (9 m)

15 ft (5 m)

Not Allowable

Not Allowable

40 psi (279 kPa)

100 ft (30 m)

90 ft (27 m)

70 ft (21 m)

50 ft (15 m)

30 ft (9 m)

12 ft (4 m)

50 psi (349 kPa)

145 ft (41 m)

115 ft (35 m)

80 ft (24 m)

80 ft (24 m)

60 ft (18 m)

40 ft (12 m)

60 psi (419 kPa)

100 ft (30 m)

100 ft (30 m)

85 ft (26 m)

60 ft (18 m)

80 psi (559 kPa)

Normal Installation should not require more than

100 ft (30 m) of drain line

140 ft (43 m)

120 ft (37 m)

100 psi (699 kPa)

150 ft (46 m)

Advertising