Installation, 1 unpacking the 6h122-16, Chapter 3 – Cabletron Systems 6H122-16 User Manual

Page 25: Unpacking the 6h122-16 -1, Chapter 3 installation

Advertising
background image

6H122-16 User’s Guide

3-1

CHAPTER 3

INSTALLATION

This chapter covers the following items:

Unpacking the 6H122-16 (

Section 3.1

)

Installing the 6H122-16 into the 6C105 chassis (

Section 3.2

)

Connecting to the network (

Section 3.3

)

Completing the installation (

Section 3.4

)

3.1

UNPACKING THE 6H122-16

1.

Open the box and remove the packing material protecting the module.

2.

Verify the contents of the carton as listed in

Table 3-1

.

Only qualified personnel should install the 6H122-16.

Table 3-1

Contents of 6H122-16 Carton

Item

Quantity

6H122-16

1

Manual Accessory Kit

1

NOTE

Before proceeding with the installation, visually inspect the
module for damage. If the module appears to be damaged,
contact the Cabletron Systems Global Call Center. Refer to

Section 1.5

for details.

Advertising