Preparing the Installation

9

Doc 01-G0674

Rev E

Preparing the Site

1 Be sure that selected gate location has required clearance for arm movement (and

counterweights on model BG790). Refer to the dimensional drawings, Figure 1 and Figure 2
on page 4.

2 Run electrical power to the site according to local electrical codes. See Table 3 below for

correct wire size and length of run (see also Figure 3). If the wire gauge is too high (wire too
small) or the run is too long, the gate may not run properly or may not run at all. Damage to
components may result.

IMPORTANT NOTE: Be sure that the available power is the proper voltage, phase,
frequency, and amperage to supply the gate. Refer to gate nameplate located inside the
service cover.

3 Select locations for control equipment and run any control wiring that may be needed (such as

loop wires, card readers, ticket spitters, pushbuttons, etc.).

WIRE SIZING CHART

SINGLE PHASE

THREE PHASE

115VAC

230VAC

230 VAC

460 VAC

575VAC

AWG

Maximum Length of Wire Run in Feet

6 700 3,100

4,750

14,225

35,550

8 450 1,925

3,000

8,975

22,425

10 275 1,225 1,900 5,650

14,075

12 175

775 1,175 3,525 8,825

Table 3

Note: Install Line Power Here. Do Not

Install Line Power in Panel shown below.

Power switch should be in the OFF position.

AUTO/MANUAL switch should be

in the “AUTO” position.