Assembly / pre-operation – Craftsman 917.881064 User Manual

Page 8

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ASSEMBLY / PRE-OPERATION

INSTALL DISCHARGE CHUTE / CHUTE ROTATOR
HEAD

(See

Fig. 7)

NOTE: The multi-wrench provided in your parts

bag

may

be used to install the chute rotator head,

1, Place discharge chute assembly on top of chute base

with discharge opening toward front of snow thrower,

2, Position chute rotator head over chute bracket. If neces­

sary, rotate chute assemblyto align square and pin on un­
derside of chute rotator head with holes in chute bracket,

3,

With chute rotator head and chute bracket aligned,

position chute rotator head on pin and threaded stud
of mounting bracket,

4,

Install 3/8 washer and locknut on threaded stud and

tighten securely.

INSTALL CHUTE DEFLECTOR REMOTE CONTROL

(See

Figs. 8 and 9)

1,

Install remote cable bracket to discharge chute with

5/16-18 carriage bolt and 5/16-18 locknut as shown.
Tighten securely,

2,

Install remote cable eyelet to chute deflector with

1/4-20 shoulder bolt, nylon washer and 1/4-20 locknut

as shown. Tighten securely,

3, Install spring hooks between hex nuts on chute rotator

head and into hole in chute deflector as shown.

CHECK TIRE PRESSURE

The tires on your snow thrower were overinflated at the fac­
tory for shipping purposes. Correct and equal tire pressure

is important for best snow throwing performance,

• Reduce tire pressure to 14-17 PSI (19-24,5 N-m),

Advertising