Mount installation – Chief Manufacturing JWDSK User Manual

Page 5

Advertising
background image

Installation Instructions

JWDSK Series

5

MOUNT INSTALLATION

After determining the site meets the installation requirements:
1.

Identify desired mounting location on wall.

2.

Using a stud finder or similar method locate studs.

3.

Align mounting holes in mount with studs making sure

mounting holes are centered on studs. (See Figure 2)

4.

Mark location of three mounting holes on wall.

5.

Drill four 1/2" (Ø13mm) holes. (See Figure 2)

Figure 2

6.

Hold metal channel on anchor (F) flat alongside plastic

straps and slide channel through hole. (See Figure 3)

Figure 3

7.

Holding plastic straps on anchor (F), pull anchor away from

wall until channel rests flush behind wall making sure

anchor channel is positioned vertically on stud as show in

figures below. (See Figure 4)

8.

Slide plastic cap on anchor (F) towards wall until flange of

cap is flush with wall. (See Figure 4)

Figure 4

9.

Snap off plastic straps on anchor at wall by pushing side to

side, snapping off straps level with flange of plastic cap.

(See Figure 5)

10. Repeat steps 6 through 9 for each mounting hole.

1/2" (Ø13mm) x4

Mounting holes

centered on

studs

(A) x1

(F) x4

Drywall

Plastic Straps

Plastic Cap

Steel Stud

Drywall

Anchor Metal Channel

SIDE VIEW

(F) x4

Advertising