Alumax 650D User Manual
Page 6

G03920296
8-13-09
Page 6
9
7
8
Lift the interior glazed panel (with the rough surface
closest to the fin) into position with the rollers engaging
the roller slot in the header
[G].
Repeat for the exterior panel (rough surface away from
the fin).
If the door panels
[H] are not parallel to the wall jams,
remove them and adjust the bearings up or down to
compensate.
Before finishing the installation it is necessary to
determine the proper closed position of the glazed door
panels
[H]. For maximum water proofing, place the in-
terior panel closest to the shower head as shown in the
detail.
On the interior panel, loosely install a towel bar
bracket
[M] to the vertical rail that is to the middle of
the unit, in the closed position, using a special 1/4-20
x 1” phil FH screw
[K]. Place a towel bar [L] into the
mounted towel bar bracket
[M] and install the remaining
towel bar bracket onto the other side of the panel using
the 1 3/4” tapered pin
[O]. Tighten both fasteners and
the set screws that hold the towel bar. Place a finger
pull
[N] over the tapered pin [O], with the set screw on
the bottom and tighten the set screw. Install the o-rings
[S] onto the finger pull if they are not already in place.
Repeat for the exterior panel.