Alumax P-DRA1Y User Manual

Page 16

Advertising
background image

16

SILICONE

13

THRESHOLD INSTALLATION

12

Apply silicone (S) between the bottom of the

fixed panel and the threshold of the base. This

is done from the outside of the shower area.

Cut the threshold (13) to the necessary

opening ensuring optimal water retention.

Proceed to applying a bead of silicone to

the underside of the threshold and placing it

on the threshold of the base.

13

13

13

CUT TO OPENING WITH

HACKSAW

HEURES

HOURS

S

HOURS

Advertising