Heading1 - 4 installation/maintenance, Heading2 - 4.1 connecting the column, Installation/maintenance – Salter Brecknell S122 User Manual
Page 28: Connecting the column, 4installation/maintenance, 1 connecting the column
Advertising

4.1 Connecting the column
4 Installation/Maintenance
S122
User /
Service Instructions
28
4
Installation/Maintenance
4.1
Connecting the column
1.
Lift the weigh
plate off the platform and remove the
packing material.
2.
Thread the load cell cable A through the column.
3.
Fasten the column to the platform using the Allen key B
provided.
4.
Remove the knob C from the bracket D and slide the
hinge apart slightly so that the plug can be threaded
through the cent
er
of the bracket. Reassemble the
bracket.
A
B
C
D
E
Advertising