Dynojet 250iP: Pit Installation Guide User Manual
Page 55
Advertising

I N S T A L L A T I O N
Routing Cables
Version 2
Model 200iP/250iP Motorcycle Pit Dynamometer Installation Guide
2-35
R
OUTING
THE
A
IR
P
UMP
P
OWER
, A
IR
F
UEL
S
ENSOR
,
AND
D
YNO
E
LECTRONICS
P
OWER
C
ABLES
1
Route the air pump power cable (P/N 76950318) from the CPI to the air pump.
2
Route the air fuel sensor cable (P/N 76950701) from the dyno electronics to the
air pump.
3
Route the dyno electronics power cable to your power source. Refer to “Dyno
Electronics” on page 1-10 for the dyno electronics power cable location.
Figure 2-37: Route the Air Pump Power, Air Fuel Sensor, and Dyno Electronics Power Cables
PD036A
air pump
CPI
dyno electronics
power cable
dyno
electronics
air pump
power cable
air fuel
sensor cable
Advertising
This manual is related to the following products: