S401 drill guide for screw spline application, Economy drill guides, Fig. # 3 – EFCO 403 Series Storefront User Manual

Page 33

Advertising
background image

EFCO CORPORATION 1/2013 PART NO. Y001

Page 33 of 94

Series 401,402, & 403 Installation Instructions

ECONOMY DRILL GUIDES

FIG. # 3

SECTION III: A. SCREW SPLINE FABRICATION

assembly holes as indicated.

the 401 glazing pocket,

Insert this lug into

then drill the screw spline

H-701

(FOR 401 SYSTEM)

horizontal.

(FOR 401 SYSTEM)

locating the drill guide

the opposite edge for

at the top of the

Use this edge or

40

1

1 3

/4"

TO

FI

NIS

HE

D F

LO

OR

extrusion being used to

(8) holes are located.
Refer to the horizontal

# 9 drill (.196 dia.),

determine the correct holes
to drill for the application
at head, intermediate, or sill.

for SCREW SPLINE APPLICATION

H-701 DRILL GUIDE (401)

TOP OF HORIZONTAL

1 3/4"






























































Advertising
This manual is related to the following products: