Step 1, Step 2, Wv410 window - installation instructions – EFCO WV410 User Manual

Page 17

Advertising
background image

EFCO CORPORATION 2/2014 PART NO. Y007

Page

17

of

21

WV410 WINDOW - INSTALLATION INSTRUCTIONS

Section VIII – Window Installation

C. Ribbon Window Installation

Step 1

Follow the procedures detailed in Steps 1 through 10 of pages 12 through 14 for the first mullion

and WV410 frame.

Step 2

After the first and second WV410 frames have been installed, the method of installation will differ
from the previous steps. Beginning at the exposed jamb of the second WV410 frame, seal around

the top and bottom of the WV410 frame where it meets the storefront horizontals. Run a bead of
sealant along the interlock of the vertical frame. See Figure 20.

DE TAIL H

DE TAIL H

DETA IL I

DETA IL I

H

I

1st Vent

Frame

2nd Vent

Frame

K320

#9837 Male

Mullion Half

#1F10 Female

Mullion Half

Exterior

Surface

Apply sealant to

the Vent Frame

Interlock

Seal joints at the top

and bottom of the

vent frame

Figure #20

Figure #21

* Drawings on this page are not to scale.

Advertising