Step 3, Fig. 3, Step 4 – FAB Defense SBT- V58 Buffer Tube User Manual

Page 2: Fig. 4 fig. 5 step 5

Advertising
background image

43, Yakov Olamy St.
Mishmar Hashiva

ISRAEL 50297

Tel: +972 3 960 3399

Fax: +972 3 960 3312

defense.com

-

www.fab

Website:

Step 3.

Screw the Connecting Nut (2) into the

rear part of the Receiver (Fig 3).

Fig. 3

2

Step 4.

Using the 4 mm Alen Key (4) attach firmly the SBT- V58 Buffer Tube(1) to the

Rifle as shown in Figures 4 and 5 .

Fig. 4

Fig. 5

Step 5.

Take out the 4 mm Alen Key.

Your Rifle is ready for Buttstock assembly.

Advertising