Installation into a 19" industrial cabinet – Kontron KISS 4U X9DR3 User Manual

Page 36

Advertising
background image

8. Assembly, Disassembly

KISS 4U V2 EATX – User's Guide (Version 1.02)

8.5. Installation into a 19" Industrial Cabinet

Expansion card installation should be performed before installing the KISS 4U V2 EATX system into a
19" industrial cabinet.

Please consider the instructions described in the section 8.4 “Accessing Internal Components”.

Before closing the industrial cabinet, you must connect your peripherals to the corresponding system
ports.

For KISS 4U V2 EATX versions and system configurations, please refer to the corresponding
“KISS 4U V2 EATX Systems - Configuration Guides” on our website

www.kontron.com

.

More information and technical data can be found in the corresponding motherboard manual, depending
on the system configuration ordered). You can download the manual from our web site at

www.kontron.com

by selecting the product.

Caution:
Energy hazards
> 240 VA are present inside the chassis!

In order to setting-up installing / removing the KISS 4U V2 EXTX platform into/from a 19" industrial

cabinet, please observe the instructions described in this manual.

4

Please consider the corresponding safety instruction included in chapter and the supplied document
“General Safety Instruction for IT Equipment”.

The system has to be mounted and installed only by qualified personnel for this area, aware of the
associated dangers.

The KISS 4U V2 EATX platform should be installed into a 19" industrial cabinet by use of slide rails or by
use of corresponding L-rack mounting brackets (not available).

For the installation of the KISS 4U V2 EATX platform in a 19" industrial cabinet, you can order from
Kontron slide rails (PN: 1016-5807) and the “Rack Slide Rails Kit for KISS 1U and KISS 2U/4U”
(PN: 1051-7200).

Ensure there is sufficient air circulation around the device when installing the KISS 4U V2 EATX platform.

The openings for air intake and exhaust on the device must not be obstructed by objects.

Leave at least 5 cm (1.969 ") of free space in front and behind the KISS 4U V2 EATX platform to prevent
the device from possibly overheating.

The 19" industrial cabinet must stand firmly in place. You can improve its stability by placing the
components into it from the bottom up. Heavy components should be placed down below.

If further stabilization is necessary, then bolt the 19" industrial cabinet to the floor or anchor it on the
wall.

The voltage feeds must not be overloaded.

Adjust the cabling and the external overcharge protection to correspond with the electrical data indicated
on the type label.

The type label is located on right side of the unit.

34

www.kontron.com

Advertising