Figure 5-1. shunt locations, 8tuffseal installation guide – Rice Lake JB8SPT TuffSeal Signal Trim Junction Box User Manual

Page 12

Advertising
background image

+1

53*.

53*.

&9

&9

4*

&9

&9

4*

&9

&9



4*

&9

&9

4*

+1

+1

4*(/"-



4&$5

&"$)6/64&%4&$5*0/

4*(/"-

$&--

$&--

$&--

4)%



4)%

4*



4*

4)%

4*



4*

4)%

4*(/"-

4&$5

$&--

$&--

4*(/"-

4*(/"-

4*(/"-

$

,

$

3*$&-",&8&*()*/(4:45&.4

$&--

4&$5

$&--

+1

&9

&9

4*

&9

&9

4*

+1

&9

&9

4*

&9

&9

4*

4&$5

4*(/"-

53*.

53*.

53*.

53*.

53*.

53*.

"TTFNCMZ

&9

&9

&9

4*

4)%



4)%

4*



4*



4*

4)%



4*

4)%

$0//&$5#05)4)6/54
50"11-:$&--4*(/"-

4*(/"-

4*(/"-

4*(/"-

$&--

1/3FW

4*

4*

4*

3&.07&4)6/550%*4$0//&$5

4&$5

563/105$-0$,8*4&

'03."9*.6.4*(/"-

4&/

4)%

4&/

4)%

%*4$0//&$5#05)4)6/54
503&.07&$&--4*(/"-

&9

4&/

4&/

$6553"$&50*40-"5&4&/4&-*/&

3

3

3

+1

+1

+1

3

3

3

3

3

3

+1

+1

+1

3

+1

+1

3

3

3

2

3

+1

3

3

+1

3

3

3

3

3

3

3

3

3

3

3

3

3

+1

+1

73

+1

3

73

+1

3

3

3

3

3

3

73

3

2

73

3

3

73

3

3

3

3

3

3

3

3

3

73

3

+1

+.1/&(

+.1104

73

73

73

73

73

+

73

+

3

&91"/4*0/+

+

"3$

+1

+1

"3(/%

+1

*0

+1

-

-

-

+

*

+

+

-

*

*/%*$"503+

+1

53*.

&9

&9

+1

+1

4*(/"-

4)%

4*(/"-

4*(/"-

$&--

+1

&9

&9

53*.

4)%

$0//&$5#05)4)6/54
50"11-:$&--4*(/"-

4*(/"-

$&--

%*4$0//&$5#05)4)6/54
503&.07&$&--4*(/"-

3

3

+1

3

3

3

3

2

3

73

73

*0

+

+

8

TuffSeal Installation Guide

Figure 5-1. Shunt Locations

7. Pull excess cable out of the enclosure.

8. Using a wrench, tighten nut until the rubber touches the cable completely.

9. Then tighten the nut an additional 1/2 turn (180

º

). To be watertight, each cord grip must be tightened so

the rubber sleeve begins to protrude from the hub.

10. Unused hubs must be properly plugged to prevent moisture entry. Extra hole plugs are provided to seal

up any unused hubs.

11. Remove the desiccant from the plastic bag, and insert the desiccant bag into the junction box before

closing. Inspect the desiccant during normal service and change desiccant as needed.

12. Replace the cover and torque the cover screws in an alternating pattern to 15 in/lb to be certain the gasket

is compressed equally in all locations.

Advertising
This manual is related to the following products: