11

SUPPLY

50/60 Hz

115 VAC

NEUTRAL

LINE / HOT
COMMON /

CALL SWITCH

USER-PROVIDED

INTERCEPTED

CALL FOR

APPROVED CALL

OR

HEAT

"DRY"

VENTER MOTOR

1 H.P. MAX @ 115 VAC

K2

MOTOR

COM

M

N

XN

NO

K1

INTERLOCK

RELAY

J1

COM

J2

JUMPER

CALL

G

R

EEN

RED

RED

AMBER

BL
UE

MAC1E OR MAC4E

PROVER

DEVICES. DO NOT
CONNECT POWER

WILL DAMAGE THE

OR F. DOING SO

TO P1, P2, C, GND

FOR TJERNLUND

GND

8

9

F

CONTROL.

AUXILIARY

34

2

67

5

C

1

P1

ON

P2

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

DO NOT SUPPLY VOLTAGE

TO "A" OR "B".

IMPORTANT:

LED3

LED5 LED4

LED2 LED1

LED6

24 OR 115 VAC

APPROVED CALL BACK TO HEATER

INTERCEPTED CALL COMMON OR NEUTRAL

24 OR 115 VAC INTERCEPTED CALL FOR HEAT

5 VDC BOARD-GENERATED POWER
DO NOT SUPPLY POWER!

115 VAC

LEGEND:

TERMINAL 2:

TERMINAL 1:

TERMINAL 4:

FIGURE 1303958-1C

LE
D

PO
WER

RED

DRY

24V

115V

(1 - 2)

PRE-PURGE SETTINGS

(3 - 8)

(9)

OPEN PROVER OPTION

POST-PURGE SETTINGS

RELAY

MTR

NO

INC.

9183006

T

JE

RNLUND

P

R

O

DUCT

S

,

R

XL

WARNING: Disconnect power supply from the UC1 and heating equipment when making wiring connections and servicing the

Venter. Failure to do so may result in personal injury and/or equipment damage. LED #6 (RED) should be off with
power removed.

GREEN

BL

UE

YELL

O

W

WHITE

BL

ACK

GREEN

WHITE

BL

ACK

GROUNDING STUD

2 FT. WHIP FROM UC1

HSJ, 1, 2 ELECTRICAL BOX

FAN PRO

VER

INSERT PROVIDED

HOLE PLUG

/N 2201018J

UC1 UNIVERSAL CONTROL WIRING SCHEMATIC

The Ground lead, Venter motor and Fan Prover leads are factory connected to the UC1 circuit board. Venter Ground, motor and Fan
Prover wiring connections are made at the free end of the 2 foot whip in HS-Series junction box.

WIRING CONNECTIONS FROM UC1 UNIVERSAL CONTROL MADE IN

HS-SERIES JUNCTION BOX

1. Connect ground from UC1 whip to grounding stud in Venter.

2. Connect Black and White leads from UC1 whip to Venter motor leads.

3. Connect Blue and Yellow leads from UC1 whip to Fan Prover switch terminals

in Venter. Yellow lead should be on switch terminal closest to Venter junction box wall.

4. Insert provided hole plug in HS-Series junction box in opening

opposite UC1 whip.

MULTIPLE APPLIANCE INTERLOCKS
To interlock with one additional 24/115 VAC heater add the MAC1E. It is a stripped
down auxiliary board version of the UC1 and is powered by and communicates with
the UC1 through a factory wired whip.

To interlock more than two 24/115 VAC heaters, add the MAC4E for a total of up to
5 heaters. It is powered by and communicates with the UC1 through a factory wired
whip. Consult factory for installations with more than 5 heaters.

To interlock a millivolt water heater and a 24/115 VAC furnace or boiler, add the
WHKE and MAC1E.

MILLIVOLT INSTALLATIONS
Each millivolt appliance interlocked with the UC1 must have its own WHKE kit
installed. The WHKE Gas Pressure Switch actuates the Venter through the A - B Dry
contacts. The Linear Limit switch disables the heater in the event of a venting mal-
function. IMPORTANT: Each millivolt appliance interlocked with the UC1 must have
its own Linear Limit spill switch.

MULTIPLE MILLIVOLT HEATER INSTALLATIONS
Multiple millivolt heaters can be installed by using the A-B dry contact terminals of
the UC1, MAC1E or MAC4E. Wire each WHKE gas pressure switch in parallel
across A-B terminals of UC1, MAC1E or MAC4E. Wire Linear Limit safety switch
into each individual millivolt heater. For further information consult factory or WHKE
instructions.