Tjernlund HSJ, 1, 2 Series with UC1 Universal Control (Version X.04) 8504106 Rev B 05/03 User Manual

Page 12

Advertising
background image

11

IMPORTANT:
RED JUMPER POSITION MUST BE THE SAME

AS APPLIANCE INTERLOCK VOLTAGE.

CALL

RELAY

INTERLOCK

COMMON

NEUTRAL

PRO

DUCT

S,

INC.

MOTOR

1 H.P. MAX @ 115 VAC

SUPPLY
115 VAC
50/60 Hz

R

T

JERNLUND 9183006

NO

MTR

M

MOTOR

RELAY

N

COM

NO

115 VAC

24 VAC

D/N 1303958-1

DO NOT SUPPLY VOLTAGE

TO "A" OR "B".

DO NOT SUPPLY POWER!

5 VDC BOARD-GENERATED POWER

HOT

24 VAC

USER-PROVIDED

CALL SWITCH

LINE

OR

"DRY"

OR

1

15V

J2

COM

24

V

DR
Y

LEGEND:

115 VAC

5

POST-PURGE SETTINGS

FOR TJERNLUND

TO P1, P2, C, GND

AUXILIARY

OR F. DOING SO
WILL DAMAGE THE

CONNECT POWER

OPEN PROVER OPTION

(9)

(3 - 8)

9

78

6

CONTROL.

DEVICES. DO NOT

F

GN
D

ON

LED1

PRE-PURGE SETTINGS

LED5 LED4

LED2

LED3

(1 - 2)

24

3

1

C

P1

P2

PROVER

J1

XL

XN

115 OR 24 VAC FROM CALL JUMPER
OR USER-PROVIDED VOLTAGE
FROM TERMINAL 3 TO 4 WITH CALL
JUMPER REMOVED

K2

K1

APPROVED

MAC1E OR MAC4E

JUMPER

RED

RED

GREEN

GREEN

AM
BER

WARNING: Disconnect power supply from the UC1 and heating equipment when making wiring connections and servicing the

Venter. Failure to do so may result in personal injury and/or equipment damage. LED #5 (RED) should be off with
power removed.

GREEN

BL

UE

YELL

O

W

WHITE

BL

ACK

GREEN

WHITE

BL

ACK

GROUNDING STUD

2 FT. WHIP FROM UC1

HSJ, 1, 2 ELECTRICAL BOX

FAN PRO

VER

INSERT PROVIDED

HOLE PLUG

/N 2201018J

UC1 UNIVERSAL CONTROL WIRING SCHEMATIC

The Ground lead, Venter motor and Fan Prover leads are factory connected to the UC1 circuit board. Venter Ground, motor and Fan
Prover wiring connections are made at the free end of the 2 foot whip in HS-Series junction box.

WIRING CONNECTIONS FROM UC1 UNIVERSAL CONTROL MADE IN

HS-SERIES JUNCTION BOX

1. Connect ground from UC1 whip to grounding stud in Venter.

2. Connect Black and White leads from UC1 whip to Venter motor leads.

3. Connect Blue and Yellow leads from UC1 whip to Fan Prover switch terminals

in Venter. Yellow lead should be on switch terminal closest to Venter junction box wall.

4. Insert provided hole plug in HS-Series junction box in opening

opposite UC1 whip.

MULTIPLE APPLIANCE INTERLOCKS
To interlock with one additional 24/115 VAC heater add the MAC1E. It is a stripped
down auxiliary board version of the UC1 and is powered by and communicates with
the UC1 through a factory wired whip.

To interlock more than two 24/115 VAC heaters, add the MAC4E for a total of up to
5 heaters. It is powered by and communicates with the UC1 through a factory wired
whip. Consult factory for installations with more than 5 heaters.

To interlock a millivolt water heater and a 24/115 VAC furnace or boiler, add the
WHKE and MAC1E.

MILLIVOLT INSTALLATIONS
Each millivolt appliance interlocked with the UC1 must have its own WHKE kit
installed. The WHKE Gas Pressure Switch actuates the Venter through the A - B Dry
contacts. The Linear Limit switch disables the heater in the event of a venting mal-
function. IMPORTANT: Each millivolt appliance interlocked with the UC1 must have
its own Linear Limit spill switch.

MULTIPLE MILLIVOLT HEATER INSTALLATIONS
Multiple millivolt heaters can be installed by using the A-B dry contact terminals of
the UC1, MAC1E or MAC4E. Wire each WHKE gas pressure switch in parallel
across A-B terminals of UC1, MAC1E or MAC4E. Wire Linear Limit safety switch
into each individual millivolt heater. For further information consult factory or WHKE
instructions.