Tjernlund SS1 SideShot with UC1 Universal Control (Version X.04) 8504102 Rev C 02/04  User Manual

Page 17

Advertising
background image

16

SIDESHOT WITH INTEGRAL UC1 CONTROL CONNECTED WITH A 24 VAC ELECTRONIC IGNITION MODULE

XN

R

UNIV

E

RS
A

L CO
NTRO

LLE

R

D/N 9183046-8

115 VAC

24 VAC

LEGEND:

HONEYWELL IGNITION

CONTROL

MV

MV

PV

CALL

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

DRY

115V

24V

IMPORTANT:

PV

MV / PV (2)

MV (1)

PV (3)

BNR GND (4)

24V GND (5)

24V (6)

(7)

(8)

SPARK (9)

OR

PI

YE

GR

YE

WH

OR

YE

WH

OR

GR

GAS VALVE

JUMPER

50/60 Hz

SUPPLY
115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

1. Remove the wire on MV at gas valve and connect it on #1 on UC1 terminal block.
2. Connect #2 on UC1 terminal block to MV/PV.
3. Connect #4 on UC1 terminal block to MV on gas valve.
4. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
5. Crimp ground wire to grounding spade in SS1 electrical box.
6. Make sure RED voltage jumper on UC1 is on 24V.

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED

WITH A SINGLE ZONE 24 VAC THERMOSTAT

XN

R

U

N

IVER

SAL C

O

N

T

R

O

LLER

THERMOSTAT

G

G

INTERNAL CONTROL

OF FURNACE

W

C
Y

R

R

Y

AS APPLIANCE INTERLOCK VOLTAGE.

RED JUMPER POSITION MUST BE THE SAME

XL

J1

J2

W

DRY

115V

24V

IMPORTANT:

D/N 9183046-5

115 VAC

24 VAC

LEGEND:

CALL
JUMPER

50/60 Hz

SUPPLY

115 VAC

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

1. Connect W from t-stat to #1 on terminal block of UC1.
2. Connect #2 on UC1 terminal block to C on internal control terminal strip of furnace/boiler.
3. Connect #4 on UC1 terminal block to W on internal control terminal strip of furnace/boiler.
4. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
5. Crimp ground wire to grounding spade in SS1 electrical box.
6. Make sure RED voltage jumper on UC1 is on 24V.

NOTE: If burner primary control goes out on lockout, the SideShot will continue to run as long as a call for heat is present.

Advertising