Vetter Universal tents User Manual

Page 9

Advertising
background image

Page 8/12

4.5 Additional Information PZ 30 and PZ 40

The pneumatic rapid deployment tents type PZ 30 and PZ 40 are
designed and manufactured as 2-chamber tents to increase safe-
ty during use.

Second inflation/

deflation connector

First inflation/

deflation

connector

Chamber

separation

Inflation and deflation are carried out with two separate connec-
tors. The inflation/deflation connectors of the tent are equipped
with quick-action couplings. To inflate, connect the correspon-
ding tube (Item No.: 1520033800) (see below).

Tent connectors

Connection coupling of the pressure regulator

To inflate the tent, connect the nipples of the inflation tubes with
the tent. Now connect the inflation tubes to the pressure reducer
and start inflating the tent. To deflate the tent, close the air source
(compressed air cylinder, etc.), then open the ball valves to relieve
the line. Then disconnect the pressure reducer. The tent is being
deflated. Decouple the inflation tube from the tent to speed up
the deflation process. Any remaining air can be removed with a
vacuum adaptor (Item No.: 1700018300) in combination with an
construction-site compressor adaptor (Item No.: 1600012000).
Also two vacuum adaptors with an construction-site compressor
adaptor can be connectes to the separate connectors of the tent
to speed up the deflation process.

Advertising