Hit Products HDC Controller User Manual

Page 13

Advertising
background image

This is the setting for establishing how long each

independent “valve” or “station” will be on to irrigate.

Each station will come on in numeric sequence

for this duration as set for each Station Run Time.

13

If two or more programs are to start at the same

time, only the first program will start and run. At

the completion of that program running, the next

program will run, and so on until all multiple

start times are run. This is called “stacking”.

7)

Rotate dial to the “Station Run Times” position.

Choose program A, B or C. To change program from

existing program, push the PRG button.

Press the + or – button to increase or decrease the

length of time you desire this specific station (valve)

to be “ON” each time this valve is activated on this

specific program.

1)

2)

3)

ESTABLISHING INDIVIDUAL

STATION RUN TIMES

Advertising