Installation guidelines – Waterworks .25 Pressure Balance Control Valve Trim with Metal Cross Handle User Manual

Page 2

Advertising
background image

11. Setting the temperature limit stop screw: Open the

valve to the maximum desired temperature then
turn the limit stop screw (8) in until it seats.

12. WARNING: FAILURE TO ADJUST THE LIMIT

STOP SCREW PROPERLY MAY RESULT IN
SERIOUS SCALDING.

13. WARNING: THIS SHOWER SYSTEM MAY NOT

PROTECT THE USER FROM SCALDING WHEN

THERE IS A FAILURE OF OTHER TEMPERATURE

CONTROLING DEVICES ELSEWHERE IN THE
PLUMBING SYSTEM.

INSTALL THE TRIM:

14. Remove the handle after setting the temperature.

15. Hand tighten the trim connector (31) completely

onto the valve body. This connector MUST be

tightened to prevent damage to the handle.

16. Slide the trim plate (30) over the trim connector

and hold the plate against the wall.

17. Thread the handle/trim adapter (29) onto the trim

connector to secure the plate against the wall. If
desired, a bead of clear silicone can be applied to

the back side of the trim plate.

18 Position the handle with the set screw hole at 6:00

then slide the handle onto the spindle. Secure the

handle to the spindle by tightening the 3mm hex set
screw (27).

19. Open the valve and confirm the temperature

setting, adjust as required.

If further assistance is required, please contact Product

Support at 1-800-927-2120 (8am-7pm EST).

Installation Guidelines

W A T E R W O R K S

Waterworks is a registered trademark of Waterworks Inc.

.25 Pressure Balance Valve Trim

These guidelines have been prepared for the professional contractor to aid in the installation of:

.25 PRESSURE BALANCE VALVE TRIM (PTSV59 & GUSV81R) All dimensions are based on
original specification and are subject to change and variation. Please consult your Design Associate for
current specifications.

04.11.07

Advertising