Windy Nation Rover Wind Turbine User Manual

Page 9

Advertising
background image

9


Figure 4


Step 2: Before mounting the Rover Wind Turbine Frame to the tower, it is recommended that
you remove the cable gland nut and the cable gland rubber grommet. This will make it easier to
pass the tower wires through the cable gland. Once this is done, pick up the Rover Wind
Turbine Frame and guide it onto the 1.5 inch Schedule 40 Tower Pipe. If you are having
difficulty guiding the three tower wires through the cable gland, tie a piece of string to the
three tower wires. Use this string to help guide the tower wires through the cable gland. See
Figure 4 above.

Figure 5

Step 3: After the Rover Wind Turbine Frame has been mounted on the tower, re-insert the
cable gland’s rubber grommet (if you removed it). Use a crescent wrench to firmly tighten the
cable gland nut. It is important to firmly tighten the cable gland nut (See Figure 5) above