4.5 Laying suction and pressure lines
4 | Compressor assembly
Fig. 16
As short as
possible
Rigid
fixed point
1
2
3
4
5
6
7
8
9
10
11
12
13
A rule of thumb: Always lay the first pipe section starting from the shut-off valve downwards and
parallel to the drive shaft.
ATTENTION Improperly installed pipes can cause cracks and tears, the result
being a loss of refrigerant.
INFO
Proper layout of the suction and discharge lines directly after
the compressor is integral to the system’s smooth running and
vibration behaviour.