Inspection – Jaclo Thermostatic extension kit - J-TH34-EXT User Manual

Page 5

Advertising
background image

4/5 PrESSurE TEST

Objective: Perform air in water pressure test.

INSPECTION

J-TH34 | PG 5

Install male adapter to both hot and cold water inlet.

Figure 4.1

Connect female air supply adapter to installed male adapter.

Figure 4.2

Install plugs on north and south side outlet ports.

Figure 4.3

Turn on air supply.

Submerge thermal body into 6 inches of water.

Figure 4.4

Rotate check stops in a 360 degree rotation from ON to
OFF, from OFF to ON positions.

Figure 4.5

Monitor entire valve for leaks, if no leaks are present valve
is in compliance. Remove from water.

Turn off air supply, remove male and female adapters.
Remove north and south plugs.

Using compressed air, blow out excess water from thermal
cartridge and stop lock nut, water inlet/outlet, and from
check stops and lock nut locations.

Figure 4.6

4.1

4.3

4.2

4.1

4.2

4.3

4.4

4.5

4.6

4.6

4.6

4.6

Note: If thermal valve body is in non-compliance
status, body must be destroyed by drilling holes
in the base at the center of the check stop
housing.

Figure 5.1

Then place on non compliance shelf.

5.1