Jaclo Thermostatic extension kit - J-TH34-EXT User Manual

Page 7

Advertising
background image

7

PACkAGING

Objective: Effectively package completed thermal valve for inventory.

J-TH34 | PG 7

Using box (#192066), tape base together.

Figure 7.1

In the bottom of the box include two flush adapters with procedure instructions
and the J-TH34 thermal valve installation instructions.

Figure 7.2

Place a sheet packaging paper in base of box.

Place completely assembled valve in box

Place a sheet of packaging paper on top of completed thermal valve.

Close tabs and secure using packaging tape.

Install J-TH34 label with UPC bar code on one end of box.

Figure 7.3

Install red colored “ATTN: Plumber!” label on top of box.

Figure 7.4

Record how many valves were completed on the work order. If valves were
found in non compliance status, record the quantity and reason for non
compliance.

Refer to step 5 for destruction process of valves in non compliance.

Record how many valves were completed on tracking log.

Place valve on shelf in pick area

7.1

7.2

7.3

7.4

Advertising
This manual is related to the following products: