AERCO AERClean User Manual
Page 2

Page 2
Benchmark Low NOx Series
AERClean Filtration System Instructions
Doc#
TID-0001-0A
Created: 10/13/2010
Revised: 11/11/2010
Owner: BS-Manager_V.D.
DOC#: TID-0001-0A
In the
BMK3.0LN boilers, the
combustion air intake duct as-
sembly is located at rear and be-
low the top surface. It is connect-
ed to the air fuel valve and exits
out of the boiler top section. The
iris-elbow comprises the lower L-
shaped duct which contains the
iris aperature.
Air Fuel Valve
1
In the
BMK1.5 and BMK2.0 boil-
ers, the combustion air intake
duct assembly is located at the
front and below the top surface
of the sheet metal top section. It
is connected to the air fuel valve
and exits out of the boiler top
section.
Air Fuel Valve
1
BMK3.0LN
Intake Duct Location
BMK1.5 and BMK2.0 (All Models)
Intake Duct Location