Step 2-system connections, Step 1-mounting the unit, Hookup steps – American Access Systems Advantage DKE - Metal - 26-100L User Manual

Page 4

Advertising
background image

Page 4 American Access Systems / Security Brands, Inc.

STEP 1-MOUNTING THE UNIT

Page 3 tells you what tools and instruments you will need to install your unit and presents a parts check list. Make sure

to have all the tools listed. Upon opening the box, check off the items enclosed with the unit. If any items are missing

from your unit, contact American Access Systems immediately.

Mounting the unit to an AAS gooseneck (18001) or double height (18003)pedestal
/ocate the four carriage bolts and four hex nuts found inside the unit box. Place the unit up to the pedestal Áange

and insert the four carriage bolts from the backside. Secure the unit to the pedestal using the four hex nuts and a

7/” socket. The extra square mounting Áange may be discarded.

STEP 2-SYSTEM CONNECTIONS

Study the :I5I1* CO/O5 CODE chart below and then proceed to the hookup steps.

WIRING COLOR CODES

:+ITE(AC +ot)(DC )

2  24 9O/TS

:+ITE(AC 1eutral)

(DC )

AC or DC

LATCH CONTACTS

B5O:1

5E/AY COMMO1

O5A1*E

1O5MA//Y OPE1

BLUE

1O5MALLY CLOSED

HOOKUP STEPS

(A). Your DKLP control unit operates on 2 to 24 volts AC or DC. Measure the voltage from the power source to

make sure it falls within these tolerances. Locate the two white wires on the circuit board and with the power off

connect them to a constant power supply.

Advertising