Awntech Savannah Series User Manual

Page 3

Advertising
background image

NOTE: YOU WILL FIND THAT THE FITTINGS HAVE BEEN PRE-INSTALLED, AS WE
HAVE PRE-ASSEMBLED AND INSPECTED IT FOR YOU IN THE FACTORY.

STEP 1: Separate all of the parts by part number so they will be easy to assemble.


YOU MAY ALSO NEED A HELPER DEPENDING ON THE SIZE, WEIGHT, LENGTH
AND HEIGHT OF THE AWNING

NOTE: YOU WILL FIND THAT THE FITTINGS HAVE BEEN PRE-INSTALLED, AS WE
HAVE PRE-ASSEMBLED AND INSPECTED IT FOR YOU IN THE FACTORY.


ASSEMBLING THE FRAME

STEP 2: Connect Front Bar (FB) to (2) Back Bars (B). Make sure that the C-Channel is
away from you and close to the wall and also make sure that the Velcro side of the Back
Bar (B) is facing you. (Please see the chart below for the height measurements).

*** all the sizes are in inches

Model

Space

between

TB and P

Height

incl

valance

Projection Model

Space

between

TB and P

Height Projection

RS22 24 31 24

RS22-NV 24 24 24

CS33 36 44 36

CS33-NV 36 36 36

CS3618 36

44

18 CS3618-NV 36 36

18

STEP 3: You may need a rubber mallet to fully seat the tubing onto the fittings.
STEP 4: Connect both Projection Bars (P) to other ends of the Back Bars (B) and make
sure that the Velcro on the Projection Bar (P) is facing you
STEP 5: Then connect the Front Bar (FB) to the Projection Bars (P) and make sure that
the Velcro is facing up
STEP 6:
Now install Cover Support (SVC) with arrows pointing upwards and attach them
to both ends of the Top Bar (TB) and Front Bar (FB). Then attach Cover Support Braces
(CSB) to Cover Supports (SVC). This will strengthen the frame
STEP 7: For larger awnings additional parts Cover Support (SVC) and Wall Supports or
Projection Bar Assembly (WS or PA) are provided for extra support
STEP 8: Install additional CVC to complete the frame assembly
STEP 9: Wall Supports or Projection Bar Assembly (WS or PA) are installed only if
needed after the Awning is hung on the wall


INSTALLING THE COVER

STEP 10: Slide the bead at the top of the fabric into the C-Channel at the top of (TB)
STEP 11: Pull the remainder of fabric over the frame with the valance hanging down
below the (SVC)s and (FB) bars.
STEP 12: Once you are satisfied with the position of the cover on the frame, wrap the
Velcro strips on the fabric tabs around the exterior bars. Pull the tabs snugly and attach
them to the pre-installed Velcro tape on the bars.

POSITIONING THE BRACKETS CORRECTLY ON THE WALL

Advertising