Crown Boiler BB100H User Manual

Page 6

Advertising
background image

4

5

Table 2.3: Connections

Key Model

BB100H

BB100I

BB100C

A

From Boiler Supply

1” Copper

B

To Boiler Return

1” MPT

C

To System

1” Copper

D

From System

1” Copper

E

Expansion Tank/Fill

1/2” FPT

F

Air Vent

1/2” FPT

G

To Indirect Water Heater

1” Copper

H

From Indirect Water Heater

1” Copper

I

DHW Inlet Connection

1/2” MPT

J

DHW Outlet Connection

3/4” MPT

Table 2.4: BB100C DHW Performance

Boiler Model

DHW Production (GPM) Approximate

Response Time (s)

Approx. DHW Set

point Range

77 Rise

90F Rise

to 100F

to 120F

BWC070

1.5

1.3

80

120

104 - 140

BWC090

2.1

1.8

70

100

104 - 140

BWC120

2.7

1.8

1

70

90

104 - 140

BWC151

2.9

1.8

1

70

90

104 - 140

Table 2.4 Notes:

At 90 degree rise, boiler input (and therefore DHW production) is reduced due to proximity of DHW outlet

1.

temperature to maximum permitted target supply temperature.

Response time is time required to reach specified temperature from a “cold start” with DHW inlet temperature of

2.

58F and a 1.0 GPM draw rate. Additonal time may be required to purge the piping between the Bimini Buddy and

the fixture.

Advertising
This manual is related to the following products: