Cecilware 2000 User Manual

Page 13

Advertising
background image

Man-page11-14.doc

12

MANUAL POUROVER UNITS

THESE INSTRUCTIONS ARE FOR INITIAL PRIMING ONLY AND DO NOT HAVE TO BE
REPEATED FOR NORMAL OPERATION
.

1. Remove sample filter pack from brew funnel and insert brew funnel back into machine.
2. Place an empty decanter on warmer plate directly under brew funnel.
3. Lift pourover cover and pour 4 decanters of cold water through the top opening at 3 minute
intervals. After the third decanter is poured, water will flow through spray head and funnel and fill
decanter beneath.
4. Plug line cord into receptacle and turn “ON” (TOGGLE UP) the heater switch, which is located in
the back, then turn on the power (and front warmer) switch which is located on the front panel. The
power switch light will light, indicating power is being applied to the machine. Wait approximately 15
minutes for the water to reach brewing temperature, at which point the green light comes on. You are
ready to brew coffee.


** BREWING INSTRUCTIONS **

MANUAL POUROVER UNITS

After initial priming has been completed
1. Insert brew funnel with filter and grounds into machine.
2. Place an empty decanter on warmer plate directly under brew funnel.
3. Lift pourover cover and pour one decanter of cold water through the top opening, coffee will be
ready in 3 1/2 minutes.
4. Remove grounds and filter as soon as coffee has dripped through. Never pour coffee back through
spent grounds.

** PRIMING AND BREWING INSTRUCTIONS**

AUTOMATIC GRAVITY FEED

THESE INSTRUCTIONS ARE FOR INITIAL PRIMING ONLY AND DO NOT HAVE TO BE
REPEATED FOR NORMAL OPERATION
.

1. Remove sample filter pack from brew funnel and insert brew funnel back into machine.
2. Place an empty decanter on warmer plate directly under brew funnel.
3. Plug the power cord into a proper receptacle.
4. Activate the Power Switch. The Green Ready Light will go ON. The tank will start filling. Allow

approximately 4-5 minutes for the tank to fill.

5. After the water tank is filled, activate the Heater Switch. Allow approximately 20 minutes for the

water to reach a brew temperature (190°F). The heat up time will depend on the water inlet
temperature, the input voltage and the wattage of the elements in the machine.

When the (green) Ready Light comes on the machine is ready to start brewing.

The machine will only brew coffee after the Ready Light (green) goes ON.

6. Press Brew Button:

** CLEANING INSTRUCTIONS **

Advertising