Crown Boiler AWI037 User Manual

Page 25

Advertising
background image

25

20) After the boiler has operated for approximately 30 minutes, check the boiler and heating system piping for leaks.
Repair any leaks found at once.

21) Inspect the vent system for flue gas leaks. Repair any leaks found before leaving the boiler in operation.

FIGURE 20: STANDING PILOT

BURNER FLAME

FIGURE 21: INTERMITTENT IGNITION

PILOT BURNER FLAME

FIGURE 22: MAIN BURNER FLAME - 1” BURNERS

FIGURE 23: MAIN BURNER FLAME - 50mm
(“HIGH ALTITUDE”) BURNERS

23

Advertising
This manual is related to the following products: