Section 7
OPERATION
1.
Pre-operation checkoff:
Check the following before starting unit.
• Check that all wiring is correct.
• Check power supply voltage.
• Check that control power transformer terminals are connected to the correct
voltages.
• Check that there is no short-circuit.
• Check that terminal screws and connectors are tight.
2.
Pre-operation adjustments:
This inverter can be adjusted according to usage and load. Refer to section 5
(Adjustments) and make the proper adjustments.
3.
Operation procedure:
Refer to the standard connection diagram (Pages 14 and 15) and perform the
following: