Christie Digital Systems P35GPS-MT User Manual

Page 26

Advertising
background image

5

CHRISTIE DIGITAL SYSTEMS P35GPS Projector

March, 2004

5-1

5 . M A I N T E N A N C E

This projector has been designed to provide years of optimum performance while requiring
only routine maintenance and cleaning. However,

CHRISTIE

strongly recommends a

periodic maintenance program of scheduled operational checks and preventive maintenance.

5.1. G

E N E R A L

M

A I N T E N A N C E

Use the program outlined in the schedule in Figure 5-1 to maximize projector life and
operating efficiency. Procedures for these operations are described in the referenced sections
of this manual.

Frequency Maintenance

Operation

Section

Daily Visual

inspection

5.2

Daily Clean

projector

5.3

Bi-weekly

Oil lateral guides and jewels

5.3

Annually

Replace belts and blow out belt dust

5.4.2

Figure 5-1: Schedule for Periodic Maintenance Operations

5.2. V

I S U A L

I

N S P E C T I O N

1. Visually inspect projector for signs of excessive dust, dirt, physical damage, frayed or

damaged cables, and loose hardware.

2. Remove, replace, and repair as necessary.
3. Visually inspect inner, outer, and shutter timing belts. Replace belts that are frayed or show

signs of wear.

4. Check belt deflection (Sections 6.4.1, 6.4.2, and 6.4.3) and re-adjust if necessary.

Ultramittent should be visually checked every 30 days. If leak is
detected, contact

CHRISTIE

to arrange for loan of substitute

Ultramittent. If leak is very slow, you may continue to operate
Ultramittent for 30 to 90 days.

Advertising
This manual is related to the following products: