Jaypro Sports HFGP-3 User Manual
Page 3

3) DIG TWO UPRIGHT FOOTING HOLES PER RECOMMENDED
DIMENSIONS. NOTE CRITICAL DIMENSION BETWEEN UPRIGHTS. SEE
DRAWING INCLUDED.
4) STAND UPRIGHTS IN FOOTING HOLES, LEVEL AND BRACE THEM
UTILIZING THE LIST OF SUGGESTED MATERIALS PROVIDED OR
LEVEL AND BRACE UPRIGHTS WITH YOUR PERSONAL IDEAS AND
MATERIALS AVAILABLE.
5) ASSEMBLE CROSSBAR ONTO UPRIGHTS WITH THE HARDWARE
PROVIDED. SEE DRAWING INCLUDED.
6) CHECK UPRIGHTS AGAIN TO ACHIEVE PROPER LEVELING.
7) MEASURE AND MIX CONCRETE ACCORDING TO THE DEALER’S
SPECIFICATIONS. SEE THE ENCLOSED POURED CONCRETE TABLE
FOR USEFUL INFORMATION.
8) FINALLY, POUR CONCRETE LEAVING APPROXIMATELY 8” BETWEEN
GROUND SURFACE AND THE CONCRETE. COVER THE NEW
CONCRETE FOOTING (TO ALLOW FOR MAXIMUM CURING
STRENGTH) WITH ANY OF THE FOLLOWING: PLASTIC, BURLAP
CLOTH, HAY, OR ANY AVAILABLE MATERIAL THAT WILL KEEP THE
SUN FROM DRYING THE CONCRETE.