4 check components, Parts list – Jaypro Sports FBGP-430C User Manual

Page 3

Advertising
background image

Installing the Jaypro Max-1 Football Goal Posts

www.jaypro.com

REV-

2

ƒ

20-foot high scaffold (or scissor lift or boom)

ƒ

10-foot (minimum) high step ladder

ƒ

Mechanic’s tool set

ƒ

Level, 3’ minimum

ƒ

100-foot tape measure

ƒ

Electric

Drill

ƒ

Drill

Bits:

o 5/16“, 1/2", and 5/8” bits

ƒ

Rubber

mallet

The following equipment is optional, but strongly recommended:


ƒ

17/32”, 21/32”, and 11/16” transfer punches (highly recommended)

ƒ

3/16”, 3/8” drill bits to pilot holes (highly recommended)

ƒ

Heavy grease or white lithium grease

ƒ

Baling wire (if using rebar)

ƒ

(6), 54-inch lengths of 5/8-inch rebar

4 Check Components

Goal posts are sold in pairs. Inspect your goal post shipment and ensure you received
these parts:

Parts List

2 Goosenecks
2 Anchor Kits
2 Crossbars
4 Twenty (or thirty)-foot uprights
4 Upright end fittings
4 Wind socks
Yellow spray paint

Check Figure 1 to confirm that your Goal Post has shipped with all hardware. If any
hardware or components are missing, contact the Jaypro Sports customer support
team, Monday through Friday, 8:00 A.M. to 5:00 P.M. Eastern Time at 1–800–243–
0533 for replacements.

Advertising
This manual is related to the following products: