Msr installation (cont’d) – Chief Manufacturing MSR Series User Manual

Page 5

Advertising
background image

Installation Instructions

MSR Series

5

MSR INSTALLATION (Cont’d)

Mount the MSR

To mount the MSR:

1. Place MSR against wall and align MSR upper

mounting holes with upper pilot hole(s) in wall.
(see Figure 5).

2. Install 5/16” x 2-½” lag bolts (20), and 5/16” washers

(30) through MSR upper mounting holes and into
upper pilot holes. DO NOT fully tighten upper lag
bolts at this time.

3. Verify lower MSR mounting hole(s) align with lower

pilot hole(s), and that MSR is properly positioned.

4. Install 5/16” x 2-½” lag bolts (20), and 5/16” washers

(30) through MSR upper mounting holes and into
lower pilot holes.

NOTE: Once mounted on wall, MSR location can be

adjusted up to a maximum of one inch right or
left of slot center, if using slotted mounting holes,
or up to a maximum of three inches right or left if
mounted using the single stud mounting holes
(see Figure 5).

5. Once MSR is properly positioned, tighten all lag

bolts.

Figure 5. MSR Positioning Adjustments

6” max. “ Side to Side”
Adjustment

2” max. “Side to Side”
Adjustment

Advertising