Honeywell vs8421, Troubleshooting – Vermont Casting NVC43 User Manual

Page 16

Advertising
background image

16

NVC Series B-Vent

20000194

Remove glass door before service work

Honeywell VS8421

START

CHECK

Gas Supply On

Pilot Lights With Piezo
Ignitor

•

Lockout Has Engaged. Wait 60
Seconds And Try Again.

•

For Spark At Electrode While
Depressing Piezo

1/8" Gap To Pilot Hood Needed.

•

All Wiring Connections

•

Replace Piezo Ignitor

•

Supply Line Hooked Up

•

Shutoff Valve Open

Pilot Stays Lit

•

For Air In The Lines

•

Thermopile Needs A Min.
325mv. Adjust Pilot Flame
Height.

•

All Wiring Connections

•

Replace Thermopile

•

Thermocouple Needs A Min. Of
14mv

•

Defective Valve. Turn To Pilot,
Meter Should Read Greater
Than 100mv. If Not, Replace.

Pilot Lights Main Burner

•

Valve Is Turned On

•

Wall Switch Is Not Turned On.
Watch For Grounded Wires!

•

Thermopile Needs A Min. 325mv.

•

Plugged Burner Orifice

System Ok

Troubleshooting

YES

YES

YES

YES

NO

NO

NO

NO

Advertising