Unpacking/installation – KERN & SOHN GAB 30K5DNM User Manual
Page 10
Advertising

10
GAB-N-BA-e-1315
5.2 Unpacking/installation
Carefully remove the balance from the packaging, remove plastic cover and setup
balance at the intended workstation.
Ensure that transport guard has been removed
(only existing in 6 kg models)
To loosen
the transport guard screw out transport screw [1] anticlockwise.
For transportation
screw down the transport screw till to the stop in clockwise
direction.
1
Advertising
This manual is related to the following products: