Mpg111md instructions #4, Malone – Malone MPG111MD User Manual
Page 5

Installation & Loading Instructions - MPG111MD Stax Pro
MALONE
R
. Place the kayak onto the Foam Blocks
and against the carriers. Dress the free
ends of the straps under the cross bar
and back up and through the buckles.
Pull down to tighten. See image 17.
Step 4: Loading Two Kayaks
. Install the Bow & Stern Safety Lines (
purchased
separately
) per enclosed instructions. Confirm
that the kayak is evenly seated in the Foam
Blocks and securely strapped to the carriers.
See image 18.
. Always place the carriers in the fold-
down position when not transporting
kayaks . See image 19.
. Always check all safety lines and load
straps for proper and secure attachment
before transport. Use of this product
for any other applications other than
kayak transport voids warranty.
16
17
18
19
. Place a 2nd set of Foam Blocks (
purchased
separately
), on cross bar. Dress free ends of
12’ Load Straps (
purchased separately
) through
the unused strap slots in the carriers. Loop
and place parallel to carriers. Load second
kayak. See image 16.
Remove carriers before entering
an automatic car wash
TM