Mpg111md instructions #4, Malone – Malone MPG111MD User Manual

Page 5

Advertising
background image

Installation & Loading Instructions - MPG111MD Stax Pro

MALONE

R

. Place the kayak onto the Foam Blocks

and against the carriers. Dress the free

ends of the straps under the cross bar

and back up and through the buckles.

Pull down to tighten. See image 17.

Step 4: Loading Two Kayaks

. Install the Bow & Stern Safety Lines (

purchased

separately

) per enclosed instructions. Confirm

that the kayak is evenly seated in the Foam

Blocks and securely strapped to the carriers.

See image 18.

. Always place the carriers in the fold-

down position when not transporting

kayaks . See image 19.

. Always check all safety lines and load

straps for proper and secure attachment

before transport. Use of this product

for any other applications other than

kayak transport voids warranty.

16

17

18

19

. Place a 2nd set of Foam Blocks (

purchased

separately

), on cross bar. Dress free ends of

12’ Load Straps (

purchased separately

) through

the unused strap slots in the carriers. Loop

and place parallel to carriers. Load second

kayak. See image 16.

Remove carriers before entering

an automatic car wash

TM

Advertising