NORAC UC4+BC+HD3 Part 1 User Manual

Page 26

Advertising
background image

23

Figure 26: Cable Configurations: C11, C12, C16 and C03

7. Connect the 6-pin shroud (S6) on the

interface cable (C12) to the mating
connector (T6A) on C11 (Figure 26).

8. Route C12 to the Hardi main lift valve

block.

9. Insert 2 sets of tees between the

matching Hardi main lift valve
connections in accordance to the labels
on wires.

10. Connect the 3-pin tower (T3) on the

roll pigtail cable (C16) to the mating
connector (S3) on C11.

11. Connect the wires labeled “LEFT” and

RIGHT” on C16 to the Hardi left and
right tilt cartridge valve, respectively.

C16 may have labels “CW” and

“CCW” on it in place of “LEFT”
and “RIGHT”.

12. Connect the 3-pin shroud on C13 to

the mating connector (T3) on C11.
Insert the tee on C13 between the
connectors on the bypass valve.

13. Connect the 6-pin tower on the valve

cable (C03) onto the mating connector
(S6A) on C11.

14. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.

Figure 27: Valve Cable Connections

15. Connect the CAN Node cable (C02B)

to the 4-pin AMP plug on C11 (Figure
28
).

Advertising