NORAC UC4+BC+HD3 Part 1 User Manual
Page 27
Advertising
24
16. Route the CAN Node cable (C02B) to
the roll sensors which are installed in
Section 4.4. Follow existing cables
and/or hydraulic lines.
17. Connect the 4-pin AMP connectors to
the roll sensors.
18. Connect the sensor branch cable (C02)
to the 4-pin AMP plug on C02B
(Figure 28).
19. Route the sensor branch cable (C02) to
the wing and main sensors and connect
to the sensors. Follow existing cables
and/or hydraulic lines along the boom.
20. Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.
Figure 28: Cable Configurations: C11, C02 and C02B
Advertising