3 hydraulic plumbing – NORAC 5467BC-4B-JD10 User Manual

Page 18

Advertising
background image



15

6.3 Hydraulic Plumbing

From this point on in the installation the booms will be inoperative until the

hydraulics are fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. Connect hoses H02 to the “A” and “B” ports of the NORAC expansion block and route to

the roll cylinder.

3. Connect the hose from the “A” port to the port on the rod end of the cylinder using a

6MOR-6FORX90 (F12) fitting and a 6MB-6MOR (F13) fitting.

4. Connect the hose from the “B” port to the port on the barrel of the cylinder using a

6MOR-6FORX90 (F12) fitting and a 6MB-6MOR (F13) fitting.


Advertising