Conair 100 User Manual

Page 123

Advertising
background image

To S t a r t C o n v e y i n g

1

Move the MDC to the processing machine. Lock the wheels and connect the
main power source. Connect the water source if you have an aftercooler.

2

Mount the vacuum receiver on the feed throat. Push the vacuum receiver
onto the mounting bracket.

3

Place the appropriate material
insert inside the distribution box.

4

Make sure all hoses are connected
securely.

5

Adjust the demand sensor. Position the sensor at the lowest
level of material that you want to maintain in the viewing
chamber before another load cycle begins. Make sure the
sensor rests against the sight glass.

6

Set the load time. Once the load time is set above zero, conveying will start.
See page 4-6, Screen 9

2

3

1” opening

Virgin material insert

Regrind material insert

1.25” opening

Central

When configured as
a central dryer, the
MDC option is not
available.

A p p e n d i x l

G - 1 3

Advertising
This manual is related to the following products:

25, 50, 7.5, 15