Installation instructions – Reznor R6GN Option - Installation - Horiz. Roof Curb w/Supply Duct (559543) User Manual
Page 4
Advertising

INSTALLATION INSTRUCTIONS FOR
559543
HORIZONTAL ROOF CURB WITH DUCT
USED WITH R6GN 150/180 UNITS
Form# NEIHDCRB11
JANUARY 22, 2009
INSTALLATION
INSTRUCTIONS
RIGID IN SU LA TION
(FIELD SUP PLIED)
ROOF INSTRUCTIONS
CURB FRAME
COUNTER FLASH ING
(FIELD SUP PLIED)
ROOF ING FELT
(FIELD SUP PLIED)
CANT STRIP
(FIELD SUP PLIED)
Step 12:
Install both condenser pans (D) as shown in Figure 8.
Step 13:
Install both condenser pans (E) as shown Figure 8.
Step 14:
If the curb is being assembled and moved to another location,
attach the condenser pans.
Step 15:
Place the ¾" x 1 ¼" gasket on all of the top edges of the roof
curb, including the condenser pans.
Fig ure 8
24
32 ¾
77 ½
74
91
94 ½
6 ½
(E)
DUCT SIZES ARE:
Supply 66 X 18 ½
(D)
(E)
WOOD NAILER
SUPPLY
21
2
2
65 ½
18
(D)
37 ¼
Advertising
See also other documents in the category Reznor Radiators:
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)